RCC Culverts Construction for Swat Motorway




Hello friends, In have gone to Swat motorway for visit with my Engineers friends, there I saw many rcc culverts because there are more streams which can make problems for motorway, there were more than 8 culvert and 6 bridges just in 3 km distance, after 3km there is Tunnel in Swat motorway which distance is 1300 m = 1.3km.

This motorway stretches from Nowshera to Chakdara in Lower Dir District, passing through Swabi, Mardan, and Malakand Districts. The project was inaugurated in August 2016 and is expected to be completed by the end of 2018. With completion of the expressway, travel time from Nowshera to Chakdara will be reduced from three hours to one hour. The Nowshera-Swat Expressway is being constructed by the frontier works organizations and will cost ₨36 billion (US$340 million).




For more detail watch the given video of my channel:

 

Written by: Engr Sami Ullah Stanikzai




 

 

Add a Comment

Your email address will not be published. Required fields are marked *